Transition Section Lifter
$240.57
- Lifts GEVO Stage 1, Stage 2 & FDL Transition sections.
- 6’ lifting strap to clear stack and hatch of locomotive.
- Enables crane lifting vs. manual extraction.
- Safety strap attached to connect to carbody frame when temporarily disconnected from the crane during repositioning. Slack in safety strap can be adjusted as necessary.
- Knurled handle to hand tighten lifter.
SKU: 0570
Category: Locomotive
Related products
-
Traction Motor Stacking Fixture
$936.60Floor space is something every locomotive shop is in need of. The Traction Motor Stacking Fixtures safely allow motors to be stacked two high, reducing storage space by one hundred percent. Holds traction motor combos with wheels up to 44″ in diameter.It will be necessary to place either a steel or wood block under the traction motor closest to the floor to provide a reasonably level platform to stack the upper motor. Steel stacking bases are available.
Part No. 0032
-
Drop Pit Rail Clamp
$1,449.96BOLT-ON DROP PIT RAIL CLAMPS
Use these clamps to hold a locomotive in place during traction
motor replacement using drop tables.
The clamps are held securely in place
on the rail simply by tightening two bolts. They are not intended
for use as a derail or other method of blue flag protection.
Item # 0253 –1 ( Set Of Four Clamps, Two Left And Two Right)